If you have troubles since the update to WordPress 4.5 please read this post before opening a new thread.

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #26524

    Is there any way to change the order of the slides in the slideshows instead of having to delete them and re-upload them?

    #130726

    Hi,

    I think that is the only way to re-order them.

    Regards,

    Ismael

Viewing 2 posts - 1 through 2 (of 2 total)

The topic ‘Change Order of Slides on Slideshow’ is closed to new replies.